ActewAGL Distribution
Schedule of electricity network charges 2010-2011
The following charges will apply from 1 July 2010. Accounts issued on or after this date will be charged on a pro-rata basis.
The charges contained in this schedule will be payable to ActewAGL Distribution:
- for, or in connection with the use of the electricity network
- for the provision of metering equipment, meter reading and data forwarding
- for miscellaneous services.
Also included in this schedule are the arrangements for the reimbursement to retailers under the ACT Government’s Electricity Feed-in (Renewable Energy Premium) Act 2008.
Prices include Goods and Services Tax of 10 per cent where stated.
Use of network charges
| Code |
Description |
2010-11 GST-exclusive rate |
2010-11 GST-inclusive rate |
010 | Residential Basic Network The Residential Basic Network charge shall be: |
| | - a network access charge per day
| 14.01c | 15.411c |
| | | 5.85c per kWh | 6.435c per kWh |
015 | Residential TOU Network The Residential TOU Network charge shall be: |
| | - a network access charge per day
| 14.01c | 15.411c |
| | - for energy consumption at max times (as defined)
| 8.43c per kWh | 9.273c per kWh |
| | - for energy consumption at mid times (as defined)
| 4.75c per kWh | 5.225c per kWh |
| | - for energy consumption at economy times (as defined)
| 3.53c per kWh | 3.883c per kWh |
020 | Residential 5000 Network The Residential 5000 Network charge shall be: |
| | - a network access charge per day
| 35.51c | 39.061c |
| | - energy consumption for the first 60 kWh per day (pro-rata over billing period)
| 4.25c per kWh | 4.675c per kWh |
| | - energy consumption above 60 kWh per day
| 5.85c per kWh | 6.435c per kWh |
030 | Residential with Heat Pump Network The Residential with Heat Pump Network charge shall be: |
| | - a network access charge per day
| 78.51c | 86.361c |
| | - energy consumption for the first 165 kWh per day (pro-rata over billing period)
| 2.74c per kWh | 3.014c per kWh |
| | - energy consumption above 165 kWh per day
| 5.85c per kWh | 6.435c per kWh |
040 | General Network The General Network charge shall be: |
| | - a network access charge per day
| 27.66c | 30.426c |
| | - energy consumption for the first 330 kWh per day (pro-rata over billing period)
| 9.03c per kWh | 9.933c per kWh |
| | - energy consumption above 330 kWh per day
| 11.90c per kWh | 13.090c per kWh |
060 | Off-Peak (1) Night Network The Off-Peak 1 Night Network charge shall be: |
| | | 1.16c per kWh | 1.276c per kWh |
070 | Off-Peak (3) Day and Night Network The Off-Peak (3) Day and Night Network charge shall be: |
| | | 1.56c per kWh | 1.716c per kWh |
| | Renewable Energy Generation | | |
080 | Streetlighting Network The Streetlighting Network charge shall be: |
| | - a network access charge per day per account
| 28.00c | 30.80c |
| | | 5.37c per kWh | 5.907c per kWh |
090 | General TOU Network The General TOU Network charge shall be: |
| | - a network access charge per day
| 27.66c | 30.426c |
| | - for energy consumption at business times (as defined)
| 14.00c per kWh | 15.40c per kWh |
| | - for energy consumption at evening times (as defined)
| 7.32c per kWh | 8.052c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 3.08c per kWh | 3.388c per kWh |
Low Voltage TOU Demand Network |
101 | LV TOU kVA Demand Network | | |
| | - a network access charge per connection point per day
| 35.00c | 38.50c |
| | - for maximum demand in a billing period, a charge per day of
| 37.60c per kVA | 41.360c per kVA |
| | - for energy consumption at business times (as defined)
| 4.42c per kWh | 4.862c per kWh |
| | - for energy consumption at evening times (as defined)
| 2.97c per kWh | 3.267c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 1.64c per kWh | 1.804c per kWh |
103 | LV TOU Capacity Network (required for low voltage customers with embedded generator) | | |
| | - a network access charge per connection point per day
| 35.00c | 38.50c |
| | - for maximum demand in a billing period, a charge per day of
| 17.30c per kVA | 19.030c per kVA |
| | - a capacity charge per day of (for the maximum demand over the previous 12-month period)
| 17.30c per kVA | 19.030c per kVA |
| | - for energy consumption at business times (as defined)
| 4.42c per kWh | 4.862c per kWh |
| | - for energy consumption at evening times (as defined)
| 2.97c per kWh | 3.267c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 1.64c per kWh | 1.804c per kWh |
High Voltage TOU Demand Network with ActewAGL low voltage network | | |
111 | HV TOU Demand Network The HV TOU Demand Network charge for a customer with a low voltage network owned and maintained by ActewAGL shall be: | | |
| | - a network access charge per connection point per day
| $13.00 | $14.30 |
| | - for maximum demand in a billing period, a charge per day of
| 15.20c per kVA | 16.720c per kVA |
| | - a capacity charge per day of (for the maximum demand over the previous 12-month period)
| 15.20c per kVA | 16.720c per kVA |
| | - for energy consumption at business times (as defined)
| 3.95c per kWh | 4.345c per kWh |
| | - for energy consumption at evening times (as defined)
| 2.63c per kWh | 2.893c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 1.50c per kWh | 1.650c per kWh |
112 | HV TOU Demand Network — Customer HV The HV TOU Demand Network charge for a customer with a low voltage network owned and maintained by ActewAGL, where the customer owns and is responsible for their high voltage assets (including transformers and switch gear), shall be: | | |
| | - a network access charge per connection point per day
| $13.00 | $14.30 |
| | - for maximum demand in a billing period, a charge per day of
| 14.20c per kVA | 15.620c per kVA |
| | - a capacity charge per day of (for the maximum demand over the previous 12-month period)
| 14.20c per kVA | 15.620c per kVA |
| | - for energy consumption at business times (as defined)
| 3.95c per kWh | 4.345c per kWh |
| | - for energy consumption at evening times (as defined)
| 2.63c per kWh | 2.893c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 1.50c per kWh | 1.650c per kWh |
High Voltage TOU Demand Network without ActewAGL low voltage network | | |
121 | HV TOU Demand Network — Customer LV The HV TOU Demand Network charge for a customer that owns and is responsible for their own low voltage network shall be: | | |
| | - a network access charge per connection point per day
| $13.00 | $14.30 |
| | - for maximum demand in a billing period, a charge per day of
| 15.20c per kVA | 16.720c per kVA |
| | - a capacity charge per day of (for the maximum demand over the previous 12-month period
| 15.20c per kVA | 16.720c per kVA |
| | - for energy consumption at business times (as defined)
| 3.53c per kWh | 3.883c per kWh |
| | - for energy consumption at evening times (as defined)
| 2.26c per kWh | 2.486c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 1.34c per kWh | 1.474c per kWh |
122 | HV TOU Demand Network — Customer HV and LV The HV TOU Demand Network charge for a customer that owns and is responsible for their own low voltage network, where the customer owns and is responsible for their high voltage assets (including transformers and switch gear), shall be: | | |
| | - a network access charge per connection point per day
| $13.00 | $14.30 |
| | - for maximum demand in a billing period, a charge per day of
| 14.20c per kVA | 15.620c per kVA |
| | - a capacity charge per day of (for the maximum demand over the previous 12-month period)
| 14.20c per kVA | 15.620c per kVA |
| | - for energy consumption at business times (as defined)
| 3.53c per kWh | 3.883c per kWh |
| | - for energy consumption at evening times (as defined)
| 2.26c per kWh | 2.486c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 1.34c per kWh | 1.474c per kWh |
135 | Small Unmetered Loads Network The Small Unmetered Loads Network charge shall be: | | |
| | - a network access charge per NMI per day
| 20.30c | 22.33c |
| | | 9.79c per kWh | 10.769c per kWh |
141 | Internal Network The Internal Network charge shall be: | | |
| | - a network access charge per day per account
| 27.66c | 30.426c |
| | | 9.03c per kWh | 9.933c per kWh |
Use of network charge
The local distributor charges for the use of the transmission and distribution networks. Because both networks are natural monopolies, the local distributor must operate in a completely open and transparent way with respect to these charges.
The use of network charges are published from time to time and all retailers pay identical rates.
The network charges above include both transmission and distribution use of system components.
The transmission use of system component is paid to the operator of the transmission system. It covers the use of the network from the generator to the distributor’s bulk supply point. As a local distributor ActewAGL pays this amount to Transgrid.
The distribution use of system component covers the use of the distributor’s network from the bulk supply point to the customer’s point of connection.
These charges are subject to independent regulation. They are determined, as far as possible, to be cost reflective. ActewAGL has established a number of different network rates.
Separate charges for the provision of metering equipment, meter reading and data forwarding will apply.
Application of rates
The network charge applicable to each installation shall be in accordance with the following classification of premises, places and purposes:
The Residential Basic Network charge shall be applicable to installations at private dwellings, excluding serviced apartments, but including:
- living quarters for members and staff of religious orders
- living quarters on farms
- charitable homes
- retirement villages
- residential sections of nursing homes and hospitals
- residential sections of boarding schools and educational institutions
- churches, buildings or premises which are used principally for public worship
- approved caravan sites.
Serviced apartments are premises which from time to time are available for hire for accommodation for periods that may be less than one month and where services available to the apartments include the provision and laundering of bed linen.
In respect of multiple dwellings of three or more dwelling units, the Residential Basic Network charge will be applicable only where each dwelling unit is separately metered and the account is in the name of the occupant.
When a portion of premises is used principally for domestic purposes, loads not exceeding five kilowatts, which are used for other than domestic purposes may be supplied at the Residential Basic Network charge. For this purpose, the loading of equipment shall be taken to be:
- for permanently connected equipment, the actual rating of the equipment;
- for light fittings, 60 watts per light fitting;
- for plug sockets:
- sockets rated 10 amperes or 10 amperes per phase: 500 watts or 500 watts per phase
- sockets rated other than 10 amperes: the wattage rating shall be taken as 50 times the current rating of the socket.
The Residential TOU Network charge is available only to customers eligible for the Residential Basic Network charge with a meter able to be read as a time-of-use meter. Customers are ineligible to apply for this charge if they have been on this charge in the previous 12 months and have since been supplied energy at the Residential Basic Network charge, the Residential 5000 Network charge or the Residential with Heat Pump Network charge to that premises.
The Residential 5000 Network charge is available only to customers eligible for the Residential Basic Network charge. Customers are ineligible to apply for this charge if they have been on this charge in the previous 12 months and have since been supplied energy at the Residential Basic Network charge, the Residential TOU Network charge or the Residential with Heat Pump Network charge to that premises.
The Residential with Heat Pump Network charge is available only to customers eligible for the Residential Basic Network charge and who have installed a fixed operational electric appliance which incorporates a mechanical refrigeration unit and a fan or fans, arranged so that the evaporator and the condenser can be switched to heat or cool air blown through the appliance (heat pump). Customers are ineligible to apply for this charge if they have been on this charge in the previous 12 months and have since been supplied energy at the Residential Basic Network charge, the Residential TOU Network charge or Residential 5000 Network charge to that premises.
The General Network charge is available to customers where no other defined charge, except for an off-peak network charge, is utilised, and shall include:
- installations on farms which are not living quarters and have loads exceeding five kilowatts (as defined above)
- nursing homes and hospitals, excluding residential sections
- boarding schools and educational institutions, excluding residential sections
- motels, hotels, serviced apartments and any form of accommodation used to house temporary residents for periods of less than one month at caravan parks or other temporary accommodation sites
- shops, offices, warehouses, factories, professional rooms
- social or sporting club facilities not used for domestic accommodation.
Off-peak charges are available only to customers utilising a controlled load element, taking all other energy at Residential Basic Network, Residential TOU Network or General Network rates. These charges are not available where the customer’s meter is read as an interval meter.
The Off-Peak (1) Night Network charge shall provide operation for a minimum of six hours and a maximum of eight hours within any one day, between 2200 hours (10.00pm) and 0700 hours (7.00am). The off-peak charges are applicable to recharging electric vehicles, compressing natural gas for CNG vehicles and permanent heat (or cold) storage installations of a design and rating acceptable to ActewAGL, which absorb their major energy during restricted times, but which may be boosted at the principal charge at other times.
The Off-Peak (3) Day & Night Network charge shall provide operation for a total of 13 hours in any one day. The said 13 hours shall be comprised of eight hours between 2200 hours (10.00pm) and 0700 hours (7.00am) and five hours between 0900 hours (9.00am) and 1700 hours (5.00pm). The off-peak charges are applicable to permanent heat (or cold) storage installations of a design and rating acceptable to ActewAGL, which absorb their major energy during restricted times, but which may be boosted at the principal charge at other times.
The Off Peak (3) Day & Night Network charge is applicable to:
- water heating storage units for which a test certificate has been issued indicating compliance with Australian Standard 1056 and having lower or upper and lower elements but with any upper element connected to the principal charge (rated delivery shall be not less than 160 litres)
- water heating storage units where electricity is used to supplement other forms of energy (for example, solar hot water)
- storage space heating or cooling including under-floor, concrete-slab heating systems
- swimming or spa pool heating, and associated auxiliaries, but not to spa baths.
ActewAGL will nominate the time settings for Off Peak 1 & 3 charges.
The Streetlighting Network charge shall be applicable to the night-time lighting of streets and public ways and places.
Time of use, time of use demand network and time of use capacity charges. The customer must make available all necessary equipment together with adequate accommodation for the installation and proper maintenance of the installation, all to the satisfaction of ActewAGL.
The low voltage time of use capacity charge is to be applied to all non-residential customers with a generator, other than a stand-by generator, connected on the customer’s side of the meter. The charge is available to all low voltage customers.
The high voltage time of use demand charges may be available to customers connected at a nominal voltage not less than 11,000 volts.
The Small Unmetered Loads Network charge shall be applicable to eligible installations less than 1,000 Watts, as determined by ActewAGL, including:
- telephone boxes
- telecommunication devices
- other as determined by the National Metrology Coordinator.
Consumption charges are calculated based on the assessed rating of the load and the charge period.
Streetlighting is excluded. Please refer to the Streetlighting Network charge above.
Internal Network charges are available only to ActewAGL Distribution sites.
Time periods
- Business times are defined as from 0700 hours (7.00am) to 1700 hours (5.00pm) on weekdays.
- Evening times are defined as from 1700 hours (5.00pm) to 2200 hours (10.00pm) on weekdays.
- Off-Peak times are defined as all other times.
Weekdays are Monday to Friday.
- Max times are defined as from 0700 hours (7.00am) to 0900 hours (9.00am) and from 1700 hours (5.00pm) to 2000 hours (8.00pm) every day.
- Mid times are defined as from 0900 hours (9.00am) to 1700 hours (5.00pm) and from 2000 hours (8.00pm) to 2200 hours (10.00pm) every day.
- Economy times are defined as all other times.
Standard time zone
No change is made for Daylight Savings Time. All times referred to are in Australian Eastern Standard Time.
Network access charges
Network access charges shall be applied per connection point (unless otherwise specified) and applied daily. The network access charge excludes metering charges.
Maximum demand charges
Maximum demand charges shall be applied per connection point (unless otherwise specified) and calculated on the basis of a daily rate for the maximum demand in a billing period. The maximum demand is the highest demand calculated coincident over a 30-minute clocked interval during the billing period.
Capacity charges
Capacity charges shall be applied on the same basis as maximum demand charges and calculated on the basis of a daily rate for the maximum demand recorded over the previous 12-month period. The maximum demand is the highest demand calculated coincident over a 30-minute clocked interval over the relevant period.
Loss factors |
AL00 | 1.0488 | for supply at low voltage |
AH00 | 1.0284 | for supply at high voltage |
Renewable Energy Generation
If a customer has a grid-connected renewable energy generator and the customer is not receiving the ACT feed-in tariff , the following arrangements shall apply:
- The customer shall pay the published network charge for the gross amount of energy imported from ActewAGL Distribution's network.
- ActewAGL Distribution will pay to the customer’s retailer an amount equal to the customer’s network energy tariff rate on the gross amount of energy exported.
- If the customer is on a time-of-use tariff, the customer’s network energy tariff rate for the purpose of paying the customer’s retailer shall be the middle rate (mid rate for residential customers and evening rate for commercial customers).
- If the customer is on a tariff with two or more price steps, the customer’s network energy tariff rate for the purpose of paying the customer’s retailer shall be the first rate applied.
- The customer shall continue to pay the network access charge.
- This arrangement is available only to customers with less than 30 kilowatts installed capacity of renewable generation.
In all other circumstances where a customer has a grid-connected renewable energy generator with an installed capacity of less than 30 kilowatts, including where the customer is receiving the ACT feed-in tariff, the following arrangements shall apply:
- The customer shall pay the published network charge for the gross amount of energy imported from ActewAGL Distribution's network.
- ActewAGL Distribution shall not charge the customer for the use of the network for the energy exported.
- The customer shall continue to pay the network access charge.
Metering charges
Separate charges for the provision of metering equipment, meter reading and data forwarding will apply. ActewAGL will provide ACT metering services for customers using manually-read interval meters (MRIM or Type 5), accumulation and time-of-use meters (BASIC or Type 6) and un-metered connections (UMCP or Type 7). Charges for those services are listed below.
| Code |
Description |
2010-11 GST-exclusive rate |
2010-11 GST-inclusive rate |
MP1 | Quarterly basic metering rate The quarterly basic metering rate applies to accumulation and time-of-use meters read quarterly | | |
| | - a metering charge per day per National Metering Identifier (NMI)
| 12.79c | 14.069c |
MP2 | Monthly basic metering rate The monthly basic metering rate applies to accumulation and time-of-use meters read monthly | | |
| | - a metering charge per day per NMI
| 22.34c | 24.574c |
MP3 | Time-of-use metering rate The time-of-use metering rate applies to the General TOU Network charge for which time-of-use meters are read manually monthly | | |
| | - a metering charge per day per NMI
| 22.34c | 24.574c |
MP4 | Monthly manually-read interval metering rate This manually-read interval metering rate applies to all interval meters recording at either 15- or 30-minute intervals, read manually and processed monthly | | |
| | - a metering charge per day per meter
| $1.82 | $2.002 |
MP5 | Internal metering rate The internal metering rate applies to the sites entitled to the Internal Network charge | | |
| | - a metering charge per day per NMI
| 22.34c | 24.574c |
MP6 | Quarterly manually-read interval metering rate This manually-read interval metering rate applies to all interval meters recording at either 15- or 30-minute intervals, read manually and processed quarterly. | | |
| | - a metering charge per day per meter
| 52.50c | 57.75c |
Miscellaneous charges
The following charges are payable to ActewAGL for or in connection with the use of the electricity system. These charges apply to work on standard residential and similar installations carried out in normal business hours, unless otherwise stated. Charges for work of greater complexity or outside these hours will be determined individually.
After hours charges, where applicable, apply to services performed outside normal business hours. This applies to all services requested after 1400 hours (2:00pm) on working weekdays where the services are to be performed prior to normal business hours on the next working weekday.
Normal business hours: | 0800 hours (8:00am) to 1600 hours (4:00pm) on working weekdays |
After hours: | All other times |
| Code |
Description |
2010-11 GST-exclusive rate |
2010-11 GST-inclusive rate |
For visit to re-energise or de-energise a site | | |
501 | Business hours — re-energise a site | $49.09 | $54.00 |
502 | After hours — re-energise a site | $105.45 | $116.00 |
503 | Business hours — de-energise a site | $43.64 | $48.00 |
504 | Meter test during business hours (deposit) | $60.91 | $67.00 |
505 | De-energise a site for non-payment | $81.82 | $90.00 |
506 | Special meter reading for example check read (second in a billing period) | $31.82 | $35.00 |
507 | Install interval meter at customer's request | $152.73 | $168.00 |
508 | Field visit only (de-energise a site for non-payment) | $59.09 | $65.00 |
509 | Replace meter to facilitate renewable energy installation | $152.73 | $168.00 |
Temporary connections | | |
520 | Overhead | $350.00 | $385.00 |
521 | Standard underground | $508.18 | $559.00 |
522 | Free-standing underground | $616.36 | $678.00 |
Services | | |
530 | Overhead: remove, reposition or disconnect service, per site visit | $251.82 | $277.00 |
531 | Underground: remove, reposition or disconnect service, per site visit | $606.36 | $667.00 |
Upgrade service from single to three phase at customer's request where load does not justify three phase (Service and Installation Rules clause 3.10) | | |
532 | Overhead | $325.45 | $358.00 |
533 | Underground-service cable replacement not required | $325.45 | $358.00 |
534 | Underground-service cable replacement required | $606.36 | $667.00 |
540 | Installation defect (applied where a revisit to a site is necessitated by obstructed access or non-compliance with the Service and Installation Rules) | $167.27 | $184.00 |
550 | Issue of copies of electrical drawings (per sheet or electronic equivalent) | $13.09 | $14.40 |
560 | De-energising wires (to allow safe approach, for example, for tree pruning, plant operation, oversize loads, construction activities) | $404.55 | $445.00 |
570 | Embedded generation (operational and maintenance charges for small embedded generators (other than residential photovoltaic) | | |
| | | 2% of value of connection assets per annum |
| | - for shared network assets
| 2% of value of shared assets allocated to the generator per annum (if applicable) |
ACT Government's Electricity Feed-in Renewable Energy Generation scheme
The following are the payments (negative charges) under the ACT Government Electricity Feed-in (Renewable Energy) Act 2008 together with the tariff codes applied to those payments.
| Code |
Description |
2010-11 GST-exclusive rate |
2010-11 GST-inclusive rate |
201 |
Feed-in scheme 10 2009-2029 The Feed-in scheme network rate for renewable energy generators up to 10kW to start 1 March 2009 and end 2029 will be: |
| |
| | - all renewable energy generated
| -44.05c per kWh | -48.455c per kWh |
301 |
Feed-in scheme 30 2009-2029 The Feed-in scheme network rate for renewable energy generators from 10kW up to 30kW to start 1 March 2009 and end 2029 will be: |
| |
| | - all renewable energy generated
| -34.04c per kWh | -37.444c per kWh |
302 |
Feed-in scheme 30 2010-2030 The Feed-in scheme network rate for renewable energy generators up to 30kW to start 1 July 2010 and end 2030 will be: |
| |
| | - all renewable energy generated
| -39.70c per kWh | -43.67c per kWh |
401 |
General Network with Feed-in tariff code 201 (obsolete) (for customers with interval gross metering, refer to application of rates calculation methodology) the General Network charge with Feed-in scheme network rate for renewable energy generators up to 10kW will be: |
| |
| | - a network access charge per day
| 27.66c | 30.426c |
| | - energy consumption for the first 330kWh per day (pro-rata over billing period)
| 9.03c per kWh | 9.933c per kWh |
| | - energy consumption above 330kWh per day
| 11.90c per kWh | 13.090c per kWh |
| | - all renewable energy generated
| -44.05c per kWh | -48.455c per kWh |
402 |
General Network with Feed-in tariff code 302 (for customers with interval gross metering, refer to application of rates calculation methodology) the General Network charge with Feed-in scheme network rate for renewable energy generators up to 30kW will be: |
| |
| | - a network access charge per day
| 27.66c | 30.426c |
| | - energy consumption for the first 330kWh per day (pro-rata over billing period)
| 9.03c per kWh | 9.933c per kWh |
| | - energy consumption above 330kWh per day
| 11.90c per kWh | 13.090c per kWh |
| | - all renewable energy generated
| -39.70c per kWh | -43.67c per kWh |
403 |
General Network with Feed-in tariff code 201 (obsolete) (for customers with interval sub gross metering, refer to application of rates calculation methodology) the General Network charge with Feed-in scheme network rate for renewable energy generators up to 10kW will be: |
| |
| | - a network access charge per day
| 27.66c | 30.426c |
| | - energy consumption for the first 330kWh per day (pro-rata over billing period)
| 9.03c per kWh | 9.933c per kWh |
| | - energy consumption above 330kWh per day
| 11.90c per kWh | 13.090c per kWh |
| | - all renewable energy generated
| -35.02c per kWh | -38.522c per kWh |
404 |
General Network with Feed-in tariff code 301 (obsolete) (for customers with interval sub gross metering, refer to application of rates calculation methodology) The General Network charge with Feed-in scheme network rate for renewable energy generators from 10kW up to 30kW will be: |
| |
| | - a network access charge per day
| 27.66c | 30.426c |
| | - energy consumption for the first 330kWh per day (pro-rata over billing period)
| 9.03c per kWh | 9.933c per kWh |
| | - energy consumption above 330kWh per day
| 11.90c per kWh | 13.090c per kWh |
| | - all renewable energy generated
| -25.01c per kWh | -27.511c per kWh |
408 |
General Network with Feed-in tariff code 302 (for customers with interval sub gross metering, refer to application of rates calculation methodology) The General Network charge with Feed-in scheme network rate for renewable energy generators up to 30kW will be: |
| |
| | - a network access charge per day
| 27.66c | 30.426c |
| | - energy consumption for the first 330kWh per day (pro-rata over billing period)
| 9.03c per kWh | 9.933c per kWh |
| | - energy consumption above 330kWh per day
| 11.90c per kWh | 13.090c per kWh |
| | - all renewable energy generated
| -30.67c per kWh | -33.737c per kWh |
601 |
Residential Network with Feed-in tariff code 201 (obsolete) (for customers with interval gross metering, refer to application of rates calculation methodology) the Residential Network charge with Feed-in scheme network rate for renewable energy generators up to 10kW will be: |
| |
| | - a network access charge per day
| 14.01c | 15.411c |
| | | 5.85c per kWh | 6.435c per kWh |
| | - all renewable energy generated
| -44.05c per kWh | -48.455c per kWh |
602 |
Residential Network with Feed-in tariff code 301 (for customers with interval gross metering, refer to application of rates calculation methodology) the Residential Network charge with Feed-in scheme network rate for renewable energy generators up to 30kW will be: |
| |
| | - a network access charge per day
| 14.01c | 15.411c |
| | | 5.85c per kWh | 6.435c per kWh |
| | - all renewable energy generated
| -39.70c per kWh | -43.67c per kWh |
702 |
Residential Network with Feed-in tariff code 301 (for customers with interval gross metering, refer to application of rates calculation methodology) the Residential Network charge with Feed-in scheme network rate for renewable generators up to 30kW will be: |
| |
| | - a network access charge per day
| 14.01c | 15.411c |
| | - for energy consumption at max times (as defined)
| 8.43c per kWh | 9.273c per kWh |
| | - for energy consumption at mid times (as defined)
| 4.75c per kWh | 5.225c per kWh |
| | - for energy consumption at economy times (as defined)
| 3.53c per kWh | 3.883c per kWh |
| | - all renewable energy generated
| -39.70c per kWh | -43.67c per kWh |
901 |
General TOU Network with Feed-in tariff code 201 (for customers with interval gross metering, refer to application of rates calculation methodology) the General TOU Network charge with Feed-in scheme network rate for renewable energy generators up to 10kW will be: |
| |
| | - a network access charge per day
| 27.66c | 30.426c |
| | - for energy consumption at business times (as defined)
| 14.00c per kWh | 15.40c per kWh |
| | - for energy consumption at evening times (as defined)
| 7.32c per kWh | 8.052c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 3.08c per kWh | 3.388c per kWh |
| | - all renewable energy generated
| -44.05c per kWh | -48.455c per kWh |
902 |
General TOU Network with Feed-in tariff code 301 (for customers with interval gross metering, refer to application of rates calculation methodology) the General TOU Network charge with Feed-in scheme network rate for renewable energy generators up to 30kW will be: |
| |
| | - a network access charge per day
| 27.66c | 30.426c |
| | - for energy at business times (as defined)
| 14.00c per kWh | 15.40c per kWh |
| | - for energy at evening times (as defined)
| 7.32c per kWh | 8.052c per kWh |
| | - for energy at off-peak times (as defined)
| 3.08c per kWh | 3.388c per kWh |
| | - all renewable energy generated
| -39.70c per kWh | -43.67c per kWh |
904 |
General TOU Network with Feed-in tariff code 302 (for customers with interval sub gross metering, refer to application of rates calculation methodology) the General TOU Network charge with Feed-in scheme network rate for renewable energy generators up to 30kW will be: |
| |
| | - a network access charge per day
| 27.66c | 30.426c |
| | - for energy consumption at business times (as defined)
| 14.00c per kWh | 15.40c per kWh |
| | - for energy consumption at evening times (as defined)
| 7.32c per kWh | 8.052c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 3.08c per kWh | 3.388c per kWh |
| | - all renewable energy generated
| -32.38c per kWh | -35.618c per kWh |
1001 |
LV TOU kVA Demand Network with Feed-in tariff code 201 (for customers with interval gross metering, refer to application of rates calculation methodology) the LV TOU Demand Network charge with Feed-in scheme network rate for renewable energy generators up to 10kW will be: |
| |
| | - a network access charge per connection point per day
| 35.00c | 38.50c |
| | - for maximum demand in a billing period, a charge per day of
| 37.60c per kVA | 41.360c per kVA |
| | - for energy consumption at business times (as defined)
| 4.42c per kWh | 4.862c per kWh |
| | - for energy consumption at evening times (as defined)
| 2.97c per kWh | 3.267c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 1.64c per kWh | 1.804c per kWh |
| | - all renewable energy generated
| -44.05c per kWh | -48.455c per kWh |
1002 |
LV TOU kVA Demand Network with Feed-in tariff code 301 (for customers with interval gross metering, refer to application of rates calculation methodology) the LV TOU Demand Network charge with Feed-in scheme network rate for renewable energy generators from 10kW up to 30kW will be: |
| |
| | - a network access charge per connection point per day
| 35.00c | 38.50c |
| | - for maximum demand in a billing period, a charge per day of
| 37.60c per kVA | 41.360c per kVA |
| | - for energy consumption at business times (as defined)
| 4.42c per kWh | 4.862c per kWh |
| | - for energy consumption at evening times (as defined)
| 2.97c per kWh | 3.267c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 1.64c per kWh | 1.804c per kWh |
| | - all renewable energy generated
| -34.04c per kWh | -37.444c per kWh |
1003 |
LV TOU kVA Demand Network with Feed-in tariff code 201 (for customers with interval sub gross metering, refer to application of rates calculation methodology) the LV TOU Demand Network charge with Feed-in scheme network rate for renewable energy generators up to 10kW will be: |
| |
| | - a network access charge per connection point per day
| 35.00c | 38.50c |
| | - for maximum demand in a billing period, a charge per day of
| 37.60c per kVA | 41.360c per kVA |
| | - for energy consumption at business times (as defined)
| 4.42c per kWh | 4.862c per kWh |
| | - for energy consumption at evening times (as defined)
| 2.97c per kWh | 3.267c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 1.64c per kWh | 1.804c per kWh |
| | - all renewable energy generated
| -44.05c per kWh | -48.455c per kWh |
1004 |
LV TOU kVA Demand Network with Feed-in tariff code 301 (for customers with interval sub gross metering, refer to application of rates calculation methodology) the LV TOU Demand Network charge with Feed-in scheme network rate for renewable energy generators from 10kW up to 30kW will be: |
| |
| | - a network access charge per connection point per day
| 35.00c | 38.50c |
| | - for maximum demand in a billing period, a charge per day of
| 37.60c per kVA | 41.360c per kVA |
| | - for energy consumption at business times (as defined)
| 4.42c per kWh | 4.862c per kWh |
| | - for energy consumption at evening times (as defined)
| 2.97c per kWh | 3.267c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 1.64c per kWh | 1.804c per kWh |
| | - all renewable energy generated
| -34.04c per kWh | -37.444c per kWh |
1006 |
LV TOU kVA Demand Network with Feed-in tariff code 302 (for customers with interval gross metering, refer to application of rates calculation methodology) the LV TOU Demand Network charge with Feed-in scheme network rate for renewable energy generators up to 30kW will be: |
| |
| | - a network access charge per connection point per day
| 35.00c | 38.50c |
| | - for maximum demand in a billing period, a charge per day of
| 37.60c per kVA | 41.360c per kVA |
| | - for energy consumption at business times (as defined)
| 4.42c per kWh | 4.862c per kWh |
| | - for energy consumption at evening times (as defined)
| 2.97c per kWh | 3.267c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 1.64c per kWh | 1.804c per kWh |
| | - all renewable energy generated
| -39.70c per kWh | -43.670c per kWh |
1008 |
LV TOU kVA Demand Network with Feed-in tariff code 302 (for customers with interval sub gross metering, refer to application of rates calculation methodology) the LV TOU Demand Network charge with Feed-in scheme network rate for renewable energy generators up to 30kW will be: |
| |
| | - a network access charge per connection point per day
| 35.00c | 38.50c |
| | - for maximum demand in a billing period, a charge per day of
| 37.60c per kVA | 41.360c per kVA |
| | - for energy consumption at business times (as defined)
| 4.42c per kWh | 4.862c per kWh |
| | - for energy consumption at evening times (as defined)
| 2.97c per kWh | 3.267c per kWh |
| | - for energy consumption at off-peak times (as defined)
| 1.64c per kWh | 1.804c per kWh |
| | - all renewable energy generated
| -36.73c per kWh | -40.403c per kWh |
Application of rates
ACT Government’s Electricity Feed-in Renewable Energy Generation scheme (FiT scheme)
Where a retailer has paid an occupier of a premises in accordance with subsection 6(5) of the Electricity Feed-in (Renewable Energy Premium) Act 2008, ActewAGL Distribution will reimburse the retailer in accordance with subsection 6(2) of that Act. ActewAGL Distribution’s NUOS invoices for retailers will show the reimbursement as a negative amount in the charges.
Retailers are to apply to ActewAGL Distribution for a network tariff code if a relevant network tariff code is not listed above.
Calculation methodology for Feed-in tariffs with interval meters
The tariff codes above starting with 2 or 3 will be applied with the normal tariff for that NMI, e.g. if existing NMI network tariff code is 010, then this site will now have 010 + 201 etc.
For other tariff codes starting with 4 or 6 to 10, the feed-in tariff code above starting with 2 or 3 that is to be applied along with the calculation methodology for that tariff code with interval metering data.
The network charge applicable to each installation with interval meters shall be in accordance with the following:
- for customers with interval gross metering;
- calculation shall be as per existing standard for kVA demand charges, that is 30 minute clocked interval calculated coincident (where applicable)
- data stream for energy from the grid, calculation shall be E streams only applied to energy times for kWh rates
- data stream for energy to the grid, calculation for Feed-in shall be B stream only.
e.g. NMI Network Tariff Code 401, E streams total accumulation = 3000kWh, B stream = 1000kWh
3000 x 6.95c per kWh = $208.50
1000 x -44.05c per kWh = -$440.50.
- for customers with interval sub gross metering
The customer must be paid for gross export to the grid, and must also pay for gross import from the grid. However, in this circumstance, as the customer will use the energy from the generation system within the site before passing to the grid, the calculation for the Gross Feed-in tariff must consider this in the first instance as if that power first came from the grid. Therefore the Gross Feed-in rate will be the current feed –in amount (shown as a minus) plus the standard energy charge. E.g. NMI Network Tariff Code 408; 2010 feed-in rate is minus 39.70c per kWh, plus 2010 energy rate 9.03c per kWh. Therefore Feed-in rate for this tariff is minus 30.67c per kWh.
- calculation shall be as per existing standard for demand charges (where applicable),
- data stream for energy from the grid, calculation shall be E streams only applied to energy times for kWh rates
- data stream for energy to the grid, calculation for Feed-in shall be B stream only.